WARNING: This is the _old_ Lustre wiki, and it is in the process of being retired. The information found here is all likely to be out of date. Please search the new wiki for more up to date information.

Difference between revisions of "SC'09 and Lustre Senior Technical Meeting 11/09"

From Obsolete Lustre Wiki
Jump to navigationJump to search
m
m
Line 5: Line 5:
 
* [[Media:SC09-FID-on-OST.pdf|FIDs on OST Design Presentation]] - Mike Pershin
 
* [[Media:SC09-FID-on-OST.pdf|FIDs on OST Design Presentation]] - Mike Pershin
 
* [[Media:SC09-HSM-Code.pdf|HSM Project Review]] - Nathan Rutman
 
* [[Media:SC09-HSM-Code.pdf|HSM Project Review]] - Nathan Rutman
* [[Media:SC09-SMP-Scaling.pdf|Server SMP Scaling Project Review]] - Liang
+
* [[Media:SC09-SMP-Scaling.pdf|Server SMP Scaling Project Review]] - Liang Zhen
 
* [[Media:SC09-Quota-Code.pdf|Quota Project Review]] - Johann Lombardi
 
* [[Media:SC09-Quota-Code.pdf|Quota Project Review]] - Johann Lombardi
 
* [[Media:SC09-Imperative-Recovery.pdf|Imperative Recovery Design Presentation]] - Nicolas  
 
* [[Media:SC09-Imperative-Recovery.pdf|Imperative Recovery Design Presentation]] - Nicolas  

Revision as of 11:38, 24 November 2009

About once a year, the Lustre Engineering team gathers to discuss new features under development and testing efforts. In November 2009, the senior Lustre engineers met in conjunction with the SC'09 event in Portland, Oregon, to discuss designs for upcoming features and implementation status of current development projects.